Skipped Drainage Plan
A base poured without a designed surface slope lets South Florida’s afternoon rain pool on the court and erode the sub-base over time.
Slope Built Into the Base
Drainage direction is confirmed during the site assessment and engineered into the base slope before any concrete or asphalt is placed.