The project starts with an on-site evaluation of the property’s grade, drainage path, and available footprint. Palm Beach County HOA communities frequently convert underused green space or existing tennis courts into multi-sport layouts. Layout options and court counts are confirmed after the site measurement, not before.
Base preparation covers asphalt or concrete installation, sub-base compaction, and a drainage slope calibrated for South Florida’s afternoon storm loads. UV-stable acrylic coating is applied after the base cures, with a cure and recoat interval matched to ambient temperature and humidity conditions on site.
Striping covers regulation line marking for the agreed sports configuration. Hardware installation includes basketball backboards and posts, pickleball net posts, and perimeter fencing. Where an existing court is being assessed, the builder evaluates base condition first to determine whether resurfacing or full replacement is the appropriate scope.
Why Choose Us
Why Palm Beach County Sports Courts for institutional court projects?
Accountability and process matter as much as materials when a court serves dozens of users every day.
Evaluation Before Scope
No written scope is issued until drainage and surface slope are assessed in person on your site.
Itemised Estimates
Every phase, base, surfacing, fencing, striping, appears as a separate line item so costs are clear upfront.
Base-First Resurfacing Decision
Resurfacing is only recommended after the base is inspected; replacement is scoped when the base cannot support a new coat.
Final Walkthrough Sign-Off
The job is not signed off until a walkthrough confirms the surface, drainage, striping, and hardware meet the agreed scope.
HOA & School Site Experience
Our partners work regularly on Palm Beach County HOA communities and South Florida school campuses with shared-use requirements.
Full-Scope Partner Network
We connect institutional buyers with vetted local partners who handle every phase, prep through hardware, under one coordinated plan.
Get Started
From first enquiry to a finished court ready for use
Questions HOA boards & school administrators ask before starting
What does a commercial HOA or school court project usually include?
Every project starts with an on-site evaluation of the space and drainage, followed by an itemised written estimate. That estimate covers base preparation, surfacing, fencing, lighting, and line marking. The job closes with a final walkthrough before sign-off.
Can a damaged old court be resurfaced instead of replaced?
Yes, resurfacing is an option when the existing base is structurally sound with no major heaving, deep cracking, or drainage failure. If the sub-base has shifted or water pools after rain, a full replacement gives a longer-lasting result. An on-site evaluation determines which path makes sense.
How do I know if my court has a drainage problem?
Standing water that remains 30 minutes or more after rain stops is the clearest sign. Other indicators include algae or moss growth in low spots, surface bubbling, and cracking that follows a consistent pattern across the court. An on-site drainage evaluation confirms the cause and scope.
How long will the court project take?
Timeline depends on court size, whether demolition is needed, and how much base work the site requires. A straightforward resurfacing can finish in a few days; a full new-build with site prep typically runs one to three weeks. The written estimate includes a projected schedule for your specific project.
What hidden costs can come up with demolition or site prep?
Unexpected costs most often come from poor sub-base conditions found after demolition, utility conflicts, or drainage corrections that were not visible before work started. The on-site evaluation is designed to surface these issues early so the itemised estimate reflects actual site conditions rather than best-case assumptions.
What affects the cost of a commercial HOA or school court project?
Court size, number of sports, base condition, fencing height, lighting, and drainage complexity all move the final number. Demolition of an existing surface adds cost. Most commercial projects in Palm Beach County come in at $25,000-$120,000, with the itemised estimate breaking out each line item.
Should I repair the court or replace it?
Repair makes sense when cracking is surface-level and the base drains correctly. Replacement is the better call when the sub-base has shifted, drainage has failed, or repair costs approach 50 percent or more of a new-build price. An on-site evaluation gives you a clear comparison before you commit to either path.
Will the new surface crack again?
Cracking is almost always a base problem, not a surface problem. A correctly graded and compacted sub-base with proper drainage eliminates the movement that causes cracking. Applying a new surface coat over a failing base will crack again; addressing the base first is what prevents it.