Skipped Site Grading
Pouring a base over soft or uneven ground causes the slab to settle unevenly, creating low spots where water pools and surface cracks follow.
Grading Before the Pour
Subgrade compaction and a grade check are completed first, so the base sits on stable, level ground from day one.