Unverified Layout
Staking skipped to save time means the finished court may not fit the lot or meet setback requirements.
Boundary Staking First
Exact court dimensions are staked and confirmed before any ground is disturbed or cleared.
Ground-Up Readiness
A yard that looks flat can still fail drainage, the sub-base is where a court’s longevity is decided.
What Goes Wrong Without Proper Prep
Skipping or rushing the prep phase creates structural problems no surface coat can fix later.
Staking skipped to save time means the finished court may not fit the lot or meet setback requirements.
Exact court dimensions are staked and confirmed before any ground is disturbed or cleared.
South Florida’s clay-mixed and sandy soils shift under load; an unassessed subgrade leads to surface cracking within seasons.
A soil check determines whether the subgrade needs stabilisation before base stone is placed.
A court graded without a mapped drainage path collects standing water after Palm Beach County’s heavy afternoon rain.
The drainage path is planned so water moves away from the court surface before the base layer goes in.
A subgrade compacted below standard causes the base stone above it to settle unevenly, cracking any surface installed on top.
Subgrade compaction is verified before base stone and gravel are laid, and the finished base is checked for slope tolerance.
Scope of Work
Every step from first measurement to a compacted, inspection-ready base, for any court type or property size.
Exact court boundaries are measured and staked to confirm the footprint fits the lot before clearing begins.
The site’s natural slope is assessed and a drainage path is mapped to move water away from the court area.
Existing vegetation, debris, and unsuitable material are removed to expose a workable subgrade for preparation.
The exposed subgrade is compacted to a stable standard before any base stone or gravel layer is installed.
Base stone is laid and graded to the correct slope tolerance, forming the structural foundation for the court surface.
Clay-mixed and sandy soils are identified so stabilisation needs are addressed before base work begins.
Residential lot layout, clearing, and base work.
Multi-court layout and drainage for shared facilities.
Large-footprint grading and compaction for commercial builds.
Layout verification for oddly shaped or constrained lots.
Why Choose Us
Local site conditions, a clear process, and written accountability at every stage.
Every enquiry starts with a physical site visit, slope, soil, and drainage checked in person.
Base preparation, surfacing, and line marking are scoped separately so you see exactly what each phase costs.
Every project accounts for Palm Beach County’s clay-mixed and sandy soils, so drainage plans reflect real local conditions.
Backyard, HOA, school, and commercial sites are all within scope, one point of contact regardless of property size.
The finished base is inspected for level and slope tolerance before any surface work is scheduled or approved.
The Process
01
We schedule a site visit to assess slope, soil, and drainage, and confirm the usable footprint.
02
You receive an itemised estimate covering clearing, excavation, compaction, and base installation before anything is booked.
03
The site is cleared, graded, compacted, and base stone is laid, then inspected for slope tolerance before surface work begins.
Pricing Estimates
| Work type | Typical estimated cost |
|---|---|
| Site grading and drainage preparation | $2,000-$10,000 |
| Court layout and design | $1,000-$5,000 |
| Full site preparation for a new court | $5,000-$20,000 |
We schedule a ground and drainage assessment, then put the full scope in writing before anything is booked.